Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

No change of direction in Araba, Bizkaia and Gipuzkoa

Lemoizko zentral nuklearrean langostino eta izokinen haztegia egiteko EAJk zuen proiektua Europako funtsetarako aurkeztu dute. (Argazkia: Hiruka)
Lemoizko zentral nuklearrean langostino eta izokinen haztegia egiteko EAJk zuen proiektua Europako funtsetarako aurkeztu dute. (Argazkia: Hiruka)
Zarata mediatikoz beteriko garai nahasiotan, merkatu logiketatik urrun eta irakurleengandik gertu dagoen kazetaritza beharrezkoa dela uste baduzu, ARGIA bultzatzera animatu nahi zaitugu. Geroz eta gehiago gara, jarrai dezagun txikitik eragiten.

In Gernika, the Guggenheim museum 127 million, the construction of an incinerator outside Vitoria-Gasteiz 35 million, five wind farms in several Álava mountains 270 million, the photovoltaic facilities of Armiñón 90 million, the biomass plants of Lantarón 71.2 million, the former Nuclear Power Plant of Lemoiz 117 million Basque plants, and

The Basque Government has received a total of 188 such projects in the Euskadi Next Plan, agreed with the municipalities of Bilbao, Donostia-San Sebastián and Vitoria-Gasteiz and the deputies of Álava, Bizkaia and Gipuzkoa. These European funds are intended to provide EUR 5,702.6 million, which would mean a total investment of EUR 13,135 million, as none of the grants or credits fully finance the projects.

They have presented numerous projects for the prevention of old age, the digitalisation of administration and education, urbanism, natural disasters, and although some seem interesting through the reading of the exhibition, it is clear, on the one hand, that the PNV and the PSE have taken a step further in the political direction that they have taken in the last legislatures – such as selling incinerators as a tool against climate change – and in the CSD. In addition, the projects that claim the most money are not measures taken by the climate emergency and many of them are projects that the PNV or the PSE have carried out in their electoral programs in the past legislatures, but have not managed to implement.

ARGIA has obtained a confidential document from the recommendations made by the consultant PwC to make the first list of projects selected by Lakua attractive, in which it can be seen that these loans, among others, have been used to build the second line, the sections of the TAV or the second tranche of the Super Sur in the incinerator of Zabalgarbi in Bilbao. Although the three that we have just mentioned have been removed from the list to try to channel them in another way, it is clear that the political philosophy behind it is the same. In addition, in the Basque parliaments and capitals, it is clear that the small role that the opposition has played in selecting these projects, and in many cases the lack of information.

Josu Jon Imaz, Petronor, will be the driving force behind the most expensive project that the Basque Government has proposed for the European funds.

The project with the highest economic weight is the Basque Hydrogen Corridor – BH2C. It is a project of EUR 1.144 million, of which EUR 220 million is intended to be used to collaborate with companies such as Petronor, Repsol or Sener. The aim is to promote the production and use of hydrogen and synthetic fuels.

The second project that stands out is the urban regeneration or urban regeneration of the “most affected neighborhoods” of the cities. The Basque Government expects an expenditure of EUR 1,130.4 million. In cooperation with private companies, “it aims to promote a sustainable, uniform and inclusive economic recovery in the most disadvantaged areas. With this, we want to achieve a new form of intervention in cities, promoting urban regeneration”.

Another major project for construction companies is the regeneration or regeneration of industrial soils. To this end, EUR 885 million has been provided, and as a bait for European subsidies, following the advice of PwC, the Basque Government has announced that it will work to put “strategic projects” in these locations.

The project “Capilla Volt Gigafactory” for the production of lithium and ion batteries for electric cars with Iberdrola, Petronor, Enagas, Irizar and MCC; projects such as “care economies” related to aging (282 million) or OsasunBerri (199 million), and in the training area Donostia Talent House, the international entrepreneurship center with more than 20 million people. With mobility, line 5 of the metro of Bilbao, Sarratu (Basauri) - rail connection between Galdakao and the Hospital de Usansolo (350 million) or Vitoria-Gasteiz Mobility Lab (327.5 million), among other projects directly related to culture, are the first unknown in the general photograph, whether the digital library of Euskadi (2.9 million) Finally, we should mention the project presented by the City Hall for the installation of electric car chargers in the hotels in Donostia.


You are interested in the channel: Next Generation EU
The most powerful transnational companies in the Basque Country are receiving the Next Generation EU funds, although the ecological transition has not occurred
At the request of ELA, the Latin American Multinational Observatory (OMAL) has established the European Union with 69 pages: Green and digital agenda for transnational companies. Analysis of the impact of Next Generation EU funds in Hego Euskal Herria (2020-2024). It is clear... [+]

2023-07-21 | Ula Iruretagoiena
Territory and architecture
Interruptus

Abrupt closure of the grant window for energy-saving construction works in homes. Imagine the anger of those left in the queue. Architects, builders, community managers, neighbours… The call for proposals was in force until November, but recently the Basque Government... [+]


Spain will have to make a rapid pension reform if it wants to receive European money
Europe will analyse whether the pledges on pension systems have been met, and Spain has not yet done so. If you do not, you may not receive more funds from Next Generation funds. France will pass the test, so the retirement age has increased.

Escrivá proposal for pensions: Caught in the trap of European funds
The Spanish Minister of Social Security, José Luis Escrivá, proposes a new modification of the public pension system: he wants the calculation of pensions not to be that of the last 25 years quoted, but the last 30, but of them 28 could be chosen by the worker, excluding the... [+]

Possible ecofeminist future? Yes, but far from OPERs
XXK, ODG, OMAL and ESF, along with other entrepreneurial members in ecofeminism and feminist economies, have presented the analysis of five strategic projects of economic recovery and transformation. How does public investment weaken the eco-feminist transition. The research... [+]

The economy of the European Union in the midst of the war in Ukraine
Tank above Keynes
The Ukrainian war has questioned the economic measures that had been announced for the economic recovery after COVID-19. In recent weeks the Community authorities have taken decisions of a wide variety of kinds. Some of them will directly affect the life of the general public... [+]

Lan eta pentsio erreformen kontra mobilizatuko dira sindikatuak Hego Euskal Herrian

Abenduaren 1erako manifestazioak deitu dituzte ELA, LAB, Steilas, ESK, Etxalde, CGT eta CNT sindikatuek, Espainiako Gobernua prestatzen ari den lan eta pentsio erreformen kontra eta "bizi duin baterako burujabetzaren" alde.


2021-07-18 | Unai Brea
Nicola Scherer
“Osasungintza eta zaintza lanak zeharo ahaztuta daude Next Generation funtsetan”

Nicola Scherer (Munich, 1984) Kataluniako Observatori del Deute en la Globalització (Zorraren Behatokia Globalizazioan) erakundeko ikertzailea eta Open Generation EU taldeko kidea da eta Kapitalari Planto! plataformak ekainean aurkeztu zuen Europako berreskuratze-funtsak:... [+]


2021-06-11 | Peru Iparragirre
Guggenheimen itzala Urdaibai gainean oraindik

2008an aurkeztu zutenetik behin eta berriz abiarazi eta gelditu dute Bilboko Guggenheim museoak Urdaibai inguruan bigarren adar bat zabaltzeko asmoa. Azken astean, ordea, berriz ere jarri dute mahai gainean proiektua, Europako Next Generation funtsen harira. Gernikan eta... [+]


2021-04-21 | Juan Mari Arregi
European funds: Do I plan to Brussels?
Much of the public believes that the European Next Generation EU Funds will not have to return them and will not have any consideration to get out of the crisis of the pandemic. Well, no.

2021-04-20 | Iñaki Barcena
'Next Generation': green and digital

This is what the most ambitious programme of public debt has been in the plans, which will distribute equal shares of grants and loans worth EUR 750,000 million over the next 7 years. Alongside the revival of Europe, it aims to promote a greener economy (energy transition) and... [+]


2021-04-15 | Juan Mari Arregi
Europar funtsak: Bruselari planto?

Iritzi publikoaren zati handi batek uste du Next Generation EU Europako Funtsak ez direla itzuli behar izango eta ez dutela inolako ordainik pandemiaren krisitik ateratzeko. Ba ez.


2021-03-23 | Leire Regadas
Maitane Arri Escudero. Ecofeminist activist
"Hydrogen is a circular solution for the business and image of Petronor"
Maitane Arri Escudero is a member of Ekologistak Martxan (1977, Las Arenas). After many years as a graduate and translator in Basque philology, the M15 movement aroused its passion for ecosocial activism. It focuses on politics, public management and the activity of... [+]

Eguneraketa berriak daude