Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

Sakana bets on the public and social train

  • A massive demonstration in Alsasua calling for the cessation of TAV works and the improvement of the current rail system.
Artikulu hau egilearen baimenari esker ekarri dugu.

22 April 2024 - 07:22
Zarata mediatikoz beteriko garai nahasiotan, merkatu logiketatik urrun eta irakurleengandik gertu dagoen kazetaritza beharrezkoa dela uste baduzu, ARGIA bultzatzera animatu nahi zaitugu. Geroz eta gehiago gara, jarrai dezagun txikitik eragiten.

More than 3,000 people have called for the TAV projects and works to be halted and have defended the project “Study of itineraries and joint proposal of public and social train in Burgos, Álava and Navarra”.

The basic actions of this project include the unfolding of the railway track and its suitability to circulate all types of trains. There is also the reopening of stations, the underground and the elimination of conflicting points.

The demonstration starts at 18.00 in the afternoon with the sounds of the sirens of the Altsasu firefighters, in a joyful atmosphere, with 22 tractors at the head and accompanied by joaldunak, mythological characters, trikitilaris and singing groups.

During the tour, giants and butters have offered a dance and the demonstration has ended in the plaza of the Casa de Cultura Iortia. It opened the event with the melodies of the txalaparta and the messages of the bertsolaris, in which the organizers, besides showing their opposition to the TAV, thanked the support received and underlined the existence of an alternative to this project.


You are interested in the channel: Abiadura Handiko Trena
Espainiako Sustapen Ministerioa: “Ez dakigu Ezkioko lotunea oso bideragarria den”

Josu Estarrona EH Bilduko Arabako senatariak egindako galderari erantzun dio Espainiako Sustapen Ministerioak, eta hor berretsi du Ezkioko aukera zailtasunez beteta dagoela.


PSNk AHTaren Gasteizko lotunearen alde egin du, Ezkiokoa ez dela “bideragarria” argudiatuta

"Gasteiztik egin ezean, ez da egingo", adierazi du PSNren bozeramaile Ramón Alzorrizek. Kontra azaldu dira Geroa Bai, UPN eta PP.


2025-02-20 | Gedar
Work to start the construction of the AVE between Vitoria and Burgos, moving forward
The first works to connect AVE with AHT Madrid and the AVE train will cost 2 billion euros. A demonstration was held this weekend in Pamplona to denounce the conditions of slavery in the construction works of the AVE.

AAV in the Southern Basque Country: An investment of 15 billion euros to reach Irun at high speed?
A demonstration against the high-speed train will take place in Pamplona this Saturday, called by the platform AHT Pause, at 12:00 hours from the Provincial Council. The construction of the railway line between Castejón and Pamplona continues and the Spanish Ministry of... [+]

Adif says that the situations of labor slavery denounced in the works of the AHT are "false"
After receiving the scandalous testimony that AHT Geldi denounces the existence of situations of labor slavery in the works of the High-Speed Train of Navarre, the company Adif that promotes these works has had to respond publicly: "They're a lie."

AHT Pause denounces the existence of situations of slavery in the works of the AVE of Navarre
The workers of the fast train that is being built in Navarre denounce that they are in a state of slavery during the press conference of the association AHT Pause in Pamplona.

They denounce that the AVE will lead to a large expropriation of agricultural lands in Álava
Representatives of the Añana and Trebiñu gangs, as well as farmers and ranchers in Álava, have denounced that they suffer "enormous institutional contempt" for the work of the AVE. More than two million square meters of “fertile land” will be expropriated in these places... [+]

For a quality public rail service for the Ribera

In recent weeks we have been reading "proposals" for the recovery of the railway line Castec-Soria and the maintenance of the Tudela train station in its current location, or for the construction of a new high-speed station outside the urban area with the excuse of the supposed... [+]


2024-12-18 | ARGIA
The Basque Y will not connect with Ipar Euskal Herria until at least 2042
The French Government has confirmed to the Spanish Government that the High-Speed Train will not reach Hego Euskal Herria (Irun link) until at least 2042 years later. It is not among the priorities of Paris.

TAV: The Spanish Government is considering a "third" alternative for connecting the Basque 'Y'
The Secretary of State for Sustainable Transport in Spain, José Antonio SANTANO, has stated that the Basque Government has admitted a resource on the connection of Ezpied-Itsaso, which would not "harm" Aralar.

2024-11-27 | Julene Flamarique
TAV works in the CAV are delayed until at least 2027
The Basque Government expected the High-Speed Train to be ready by 2027 when the Astigarraga-Hernani stretch ends in February 2024. The Basque Government has now launched a tender for the works of the Arkaute link, which has made available to the company Euskal Trenbide Sarea,... [+]

Polls begin in the Otsobi Council land without asking for permission
Preliminary surveys for the construction of the High-Speed Train on Otsobi Council sites have been initiated without information being provided and without request for authorisation. The Stop Surveys platform reports on the situation: "The surveys have been launched without... [+]

They call to mobilize against the TAV project running through Lapurdi
The CADE group, made up of environmental associations, has denounced that the TAV going through Lapurdi is progressing in its development. He has scheduled for 12 and 13 October in Gironde, in support of the protest organised by the Altxuak network on Earth.

Eguneraketa berriak daude