Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

The company of Josu Bergara (EAJ), former Minister of Transport and Public Works, has been awarded the work of the AVE station in San Sebastián for 861,000 euros

  • The Minister of Economic Development and Infrastructure of Lago, Arantxa Tapia, the Mayor of San Sebastián, Eneko Goia, and the Spanish Minister of Public Works, Iñigo de la Serna, presented on Monday the remodeling project of the North Station of San Sebastián in the City Hall of San Sebastián. The objective of the work is to provide access to the High Speed Train, which has been entrusted to the engineering association Eptisa/Cinsa - Jon Montero.

15 May 2018 - 12:24
Eneko Goia, Arantxa Tapia eta Iñigo de la Serna, asteleheneko aurkezpenean. Argazkia: Arantxa Tapia

Work will begin in 2019 and a budget of 861,000 euros has been set aside for this purpose. In principle, to be completed in ten months. The deck of the station will have 5,788 square meters and from there you will have access to Tabakalera. The idea is to turn this space into a square.

Pictures of Eptisa/Cinsa

Josu Bergara was President of Bizkaia from 1995 to 2003.

The Chairman of the Board of Directors of Eptisa/Cinsa is Josu Bergara Etxeberria. He is a well-known member of the Basque Nationalist Party and has had several public political responsibilities: From 1991 he was Minister of Transport and Public Works in the Government led by José Antonio Ardanza and General Power of Bizkaia from 1995 to 2003, among others. Since 2003 it has been operating outside the institutional policy. He has been Chairman of the Eptisa/Cinsa Board since March 2008.

In connection with the Bidegi cases, the Provincial Council of Gipuzkoa of the previous legislature lodged a complaint against several political representatives and companies. The company is Eptisa/Cinsa. Eptisa/Cinsa, who was in charge of the custody of part of the works of Ap-1, denounced the alleged misuse of public money used in this plot. In all, two criminal complaints were filed related to the works of the AP-1 motorway. This matter is currently open and awaiting clarification in the courts.

Exchange of favors

Larraitz Ugarte (EH Bil), a member of the previous government of the Provincial Council of Gipuzkoa, denounced in 2015 that the composition of the Boards of Directors of some Basque companies is “incomprehensible”. Mario Fernández’s “Cabieces case” was still in full swing. In the following days Garak further detailed Ugarte’s statements and published that Ugarte was referring to Eptisa/Cinsa and more specifically to Iñaki Dubreuil Churruca, a member of the Board of Directors of Eptisa/Consa of the PSE-EE. He has been a member of the council since 24 January 2011, when he took the place of Joseba Andoni Leizaola (a historical member of the PNV). In 2001, ETA wounded Dubreuil and killed two employees of Elektra. Gara noted that the inclusion of Dubreuil on the Board of Directors could be due to possible exchanges of favours between the PNV and the PSE-EE.

In the UAE 6.3 billion for AVE

On Monday, it was announced that 6,300 million euros have already been allocated to the construction of the AVE in the Basque Country. For comparison, the budget of the Department of Culture and Linguistic Policy of the Basque Government for 2018 is 253 million euros. In other words, they have spent more than all the money allocated to cultural and linguistic policy over 25 years on AVE works. The final figure will be more than 6.3 billion, as there are still some works to be carried out.

The Minister of Development and Infrastructure of the Lake Economy, Arantxa Tapia, expresses his satisfaction that the works of the AVE of the Basque Country are developing “at a good pace”. He emphasizes that 12 of the 17 works in charge of the lake are completed, and mentions that the rest "are in 70-80%".


You are interested in the channel: Abiadura Handiko Trena
Adif says that the situations of labor slavery denounced in the works of the AHT are "false"
After receiving the scandalous testimony that AHT Geldi denounces the existence of situations of labor slavery in the works of the High-Speed Train of Navarre, the company Adif that promotes these works has had to respond publicly: "They're a lie."

AHT Pause denounces the existence of situations of slavery in the works of the AVE of Navarre
The workers of the fast train that is being built in Navarre denounce that they are in a state of slavery during the press conference of the association AHT Pause in Pamplona.

They denounce that the AVE will lead to a large expropriation of agricultural lands in Álava
Representatives of the Añana and Trebiñu gangs, as well as farmers and ranchers in Álava, have denounced that they suffer "enormous institutional contempt" for the work of the AVE. More than two million square meters of “fertile land” will be expropriated in these places... [+]

For a quality public rail service for the Ribera

In recent weeks we have been reading "proposals" for the recovery of the railway line Castec-Soria and the maintenance of the Tudela train station in its current location, or for the construction of a new high-speed station outside the urban area with the excuse of the supposed... [+]


2024-12-18 | ARGIA
The Basque Y will not connect with Ipar Euskal Herria until at least 2042
The French Government has confirmed to the Spanish Government that the High-Speed Train will not reach Hego Euskal Herria (Irun link) until at least 2042 years later. It is not among the priorities of Paris.

TAV: The Spanish Government is considering a "third" alternative for connecting the Basque 'Y'
The Secretary of State for Sustainable Transport in Spain, José Antonio SANTANO, has stated that the Basque Government has admitted a resource on the connection of Ezpied-Itsaso, which would not "harm" Aralar.

2024-11-27 | Julene Flamarique
TAV works in the CAV are delayed until at least 2027
The Basque Government expected the High-Speed Train to be ready by 2027 when the Astigarraga-Hernani stretch ends in February 2024. The Basque Government has now launched a tender for the works of the Arkaute link, which has made available to the company Euskal Trenbide Sarea,... [+]

Polls begin in the Otsobi Council land without asking for permission
Preliminary surveys for the construction of the High-Speed Train on Otsobi Council sites have been initiated without information being provided and without request for authorisation. The Stop Surveys platform reports on the situation: "The surveys have been launched without... [+]

They call to mobilize against the TAV project running through Lapurdi
The CADE group, made up of environmental associations, has denounced that the TAV going through Lapurdi is progressing in its development. He has scheduled for 12 and 13 October in Gironde, in support of the protest organised by the Altxuak network on Earth.

Neither galgo nor hunting dog

We have been with the "summer snake" over the TAV for a few weeks and with the possibility of linking the "Basque Y" from Pamplona, from Ezkio or Vitoria.

It is disappointing to see that our People continue to depend on decisions concerned and not supported by the galgos and... [+]


The Spanish Government says that the connection of the TAV with Ezdox-Itsaso has "problems" and bets on that of Vitoria-Gasteiz
The Spanish Minister of Transport, Óscar Puente, has assured that the connection with Navarre "is the most acceptable" in Vitoria-Gasteiz, because the Eztango-Itsaso route has "technical complexity".

Works of the TAV and Renfe: cuts and headaches in the rail service of Gipuzkoa for seven years
Since the beginning of the tunnel excavation in Gaintxurizketa in 2017, the restrictions and conditions of the works of the TAV to the Renfe railway service have been constant. Now, the Spanish Ministry of Transport has announced that this service will be interrupted for several... [+]

2024-06-06 | Jule Goñi
Stop polls, key

In the spring of last year, in Sakana, in Izan and Goierri, flooding was introduced in the municipalities of these areas for the conduct of geological surveys for the works of the TAV. In the canyoning 15 surveys have been requested in the municipalities, from Erro to Olazti /... [+]


Eguneraketa berriak daude