Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

Extension of the Esa reservoir is welcomed by the report of the Ministry of Transition

  • Finally, the report of the Government of Spain on the safety of the Yesa reservoir has appeared, which has been “lost”, and allows the work of the reservoir to continue.

21 September 2022 - 18:42
Itoizko urtegia aurtengo abuztuaren amaieran. (Argazkia: EITB)

The study was commissioned by the Ministry of Ecological Transition to the College of Engineers of Ports, Canals and Roads, after countless reports, for it to issue a final advice. According to the report, “the hillside has sufficient stability to put the associated dams into service”. However, a filling and emptying protocol must be established to allow the immediate continuity of the dam and hillside behaviour, as well as the appropriate modifications to the construction process.

However, according to Bai's Senator Koldo Martinez Geroa, the result of the report is not so secure and full of uncertainties. In the press release published by Geroa Bai, the senator states that “since the first reading of a 637 page report many doubts arise. In the eleven pages of the conclusions, the word ‘uncertainty’ is used fourteen times.

Martinez also talks about the right side where there have been many landslides: “The high number of uncertainties present confers little reliability on any calculation or modelling for a safety coefficient”, and considers that “due to the uncertainty over the factors influencing stability, it is very difficult to demonstrate that the current conditions are above an acceptable safety factor (neither in the project nor in any official standard)”.

Lack of transparency

Both Senator Martínez and EH Member Bildu Bel Pozueta have pointed out the lack of transparency in relation to this report. The Ministry commissioned the investigation in 2018 and the College completed its work in April 2021.

The Finance Minister, Carles Mulet, in February 2020, asked the Ministry of Transition where the study was, who replied that it had already been handed over to the Government of Navarra and the Hydrographic Confederation of CHE Ebro. But the work did not show up, and last April, EH Bildu parliamentarian Adolfo Araiz asked the foral government about the report, and government spokesman Javier Ramírez told him that the government had not received the report. Finally, in response to Deputy Pozueta, the Spanish Ministry of Transition has just approved on 15 September in the Congress that left him in the hands of the Foral Government on 22 July.

Pozueta calls for the appearance of Teresa Ribera in Congress to give explanations, in the meantime, the works of the reservoir are paralysed until they are in a position to guarantee safety.


You are interested in the channel: Esa urtegia
Closure of the extension of the Esa reservoir
According to the Rio Aragon Association, the expansion of the Esa reservoir is paralyzed by "insecurity". This group requests the suspension of the contract and the revision of the project. They call on the Ebro Hydrographic Confederation to accept "unfeasibility".

2023-09-29
They want to end the expansion of the Esa reservoir by 2027
The works began 22 years ago, but the construction of the reservoir has had many problems, and the works are still going on. In response to the request of Río Aragón, the Confederación Hidrográfica del Ebro, CHE, replies that the work is scheduled for completion in 2027.

Satellite warn of the instability of the Yesa reservoir
Geological studies have warned on more than one occasion and now the warning comes from satellite surveillance: The Yesa reservoir is not stable. Copernicus, the European Union’s Earth observation programme, has detected a ‘movement’ on the slopes of the reservoir.

D. Alfredo Ollero Ojeda
“Rivers are sinking deeper and deeper into their channels”
The Ebro is the largest river in the Basque Country. We have spoken on its shore, at the entrance to Zaragoza, where Ollero lives, accompanied by the slow lertxuna, the crazy song of birds and the gentle flow of the river, the afternoon that has erupted spring at 33 degrees,... [+]

Ingeotyc geology recommends not to extend the Yesa reservoir
It concludes that the right side of the reservoir remains unstable and therefore there is a level of risk. The report was prepared by geologists Valentín Ibarra and Tomás Morales of the company Ingeotyc on behalf of the City Council of Sangüesa.

Remírez states that the Government of Spain acts rigorously in the Yesa dam, 22 years after the beginning of the works
The Vice-President of the Government of Navarre, Javier Remirez, explained in the Parliament of Navarre a study on the safety of urgency which was completed fifteen months ago and which has not been published so far. The investigation was carried out on behalf of the Government... [+]

They denounce the loss of the report commissioned by the Government of Spain on the Yesa dam
The Spanish Government's Ministry of Transition commissioned the Spanish College of Road and Port Engineers to see what the organization said about the reservoir's viability.

Suspension of the water project from Salazar to Yesa
The Ebro Hydrographic Confederation has withdrawn from its hydrological plan the project of building a dam in the village of Aizpurgi, in the Navarre Pyrenees, and its drive to the Yesa reservoir through an underground canal.

Analysis
Navarre reservoirs below the minimum: What has evidenced the drought?
The dry summer we have had in many places in Euskal Herria is already noticeable. According to data collected by the Ebro Hydrographic Confederation (CHE), the water stored in Navarre is well below the average of the last decade and in the case of the Yesa reservoir is 29% of... [+]

Korrontearen atzetik
Piszinan aurrera eta atzera aspertu egiten dira nonbait, eta 1989ko abenduaz geroztik ibaietan, urtegietan, lakuetan eta itsasoan egin dute igeri. Miño, Ebro, Sil, Bosnia-Herzegovinako Neretva ibaia gerra garaian... Nafarroako Esa urtegia, Eskoziako Ness laku famatua,... [+]

What are the risks of the large Yesa potash mine?
The Muga project, approved by the Government of Spain, provides for a mine of 1,700 hectares between the Navarros municipalities of Xabier and Undués de Lerda, very close to the Yesa reservoir. Experts say it would contaminate the rivers and aquifers in the area, sink the soil... [+]

2020-10-23 | ARGIA
“Remirez lehendakariordeak nafarren segurtasuna arriskuan jartzen du”

Esako urtegiaren inguruan eta azken asteetan Nafarroan izaten ari diren mugimendu sismikoez erakutsitako jarrera dela eta, Sustrai Erakuntzak gogor kritikatu du Javier Remirez Nafarroako Gobernuko presidenteordea eta Babes Zibileko arduraduna. Ondorengo lerroetan irakur daiteke... [+]


Esako urtegiaren lanak ez dira geldituko oraingoz

Azken bi egunetan nahasmen handia egon da Esako urtegia handitzeko lanen inguruan. Asteartean Teresa Ribera Espainiako Gobernuko Trantsizio Ekologikorako ministroak esan zuen ez zela urrats bat gehiago aurrera egingo segurtasuna erabat ziurtatu arte. Aturando Esa (Esa Gelditzen)... [+]


2020-10-07 | ARGIA
Esako urtegiko eskuin hegala ez da oraindik egonkorra, txosten ofizialak aztertuta ondorioztatu dutenez

Uraren Kultura Berria Fundazioak (FNCA gaztelaniazko sigletan) Esako urtegiari buruzko azken txosten ofizialak aztertu ditu eta ondorioztatu du urtegiaren eskuineko hegalak "ezegonkorra" izaten jarraitzen duela eta, beraz, "segurtasuna ez dagoela bermatuta".


2020-08-27 | ARGIA
Esa urtegiak sorturiko arriskua ezkutatu nahi izatea egotzi diete agintari politikoei

"Esan eta manipulazio informatiboa" izeneko idatzia zabaldu dute Esa Ez-Lanak Gelditu eta Río Aragón elkarteek hainbat hedabidetan. Agintari politikoek, azpiegitura horrek dakarren arriskua ezkutatzeko darabilten hizkera salatu dute.


Eguneraketa berriak daude