Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

Erdiz Mine: 80% of the baztans oppose it, but the government considers it of foreign interest

  • The Government of Navarra considered the magnesite mine that Magna intends to build in Erdiz to be of foral interest. The meadows of Erdiz are on Mount Alduide, which connects Baztán and Steribar, where 80 families graze.
Argazkia: Iñaki Atxa Aranburu

08 June 2023 - 11:22
Last updated: 12:32
Zarata mediatikoz beteriko garai nahasiotan, merkatu logiketatik urrun eta irakurleengandik gertu dagoen kazetaritza beharrezkoa dela uste baduzu, ARGIA bultzatzera animatu nahi zaitugu. Geroz eta gehiago gara, jarrai dezagun txikitik eragiten.

The Foral Government considers that the project is linked to economic development for the protection of employment, territorial cohesion and the environment in rural areas. The government says that 240 people work in Magnesitas Navarras, in Steribar, and their indirect work back.

The Erdiz Bizirik platform of Baztan, which opposes this project in almost two decades, denounces that Magnesitas Navarras belongs to the French multinational Roullier, and that in relation to this project, what interests or not the inhabitants of Baztan is decided in Paris. According to the association, the most unfavourable impact would be for the 80 livestock families operating in Erdiz, but the project would affect the 270 farmers operating throughout the Baztan. He added that once the mine had run out it would not be possible to recover the meadows.

The Erdiz prairie has 476 hectares, the largest in the Baztan and the highest quality. Half of them are used as feedingstuffs for cattle, and half of them intend to build the mine. The primary sector of the Baztan Valley continues to account for about 15 per cent of the economy.

Magnesite ore is scarce in Europe and, in addition to employment, Magnesitas Navarras and the foreign government are using this argument to boost the mine. According to the government, 6% of the world's magnesite is produced in Slovakia, Greece, Austria and Navarra. Therefore, many groups denounce that in these types of projects they send multinationals in Navarra.

Most baztans also in elections

The baztans have shown their rejection of the project in many ways. Numerous successful mobilizations have been carried out in Elizondo and on 22 April the opposition to the mine was brought to Pamplona, bringing together over 2,000 people in the urban fabric.

The strong opposition to the project is also reflected in the election results of May 28: 80% of voters voted against parties opposed to the project, according to URL 0. The Baztaneses Conference wanted to hold a referendum last autumn, but the Spanish Government’s delegation in Navarre banned it.

Together with the Magnesitas mine, the Foral Government has considered two other economic projects of general interest: Aluminium melting and laminating project by Urrizmendi in Uharte-Arakil and extension of the facilities and lines of the EXCAL Food Exhibition and Conservation company in Marcilla.

 

Mobilisation convened on 22 April by the Erdiz Bizirik platform in Pamplona. (Photo: X Latvian / ARGIA CC BY-SA)

You are interested in the channel: Ingurumena
The UN begins the final phase of negotiations to limit plastic pollution
The summit, which runs through the city of Busan in South Korea, will last from 25 November to 1 December. The oil-producing countries and their lobbies are putting obstacles, as they do not want to limit production.

2024-11-27 | Leire Ibar
More than 180 agents join the mobilization to guarantee the right to housing
On December 14, the Socialist Housing Union of the Basque Country and the Basque Housing Trade Union Network organized a national mobilization against the housing business in Bilbao. There are almost 200 agents who have stood in solidarity with the case.

2024-11-27 | Julene Flamarique
TAV works in the CAV are delayed until at least 2027
The Basque Government expected the High-Speed Train to be ready by 2027 when the Astigarraga-Hernani stretch ends in February 2024. The Basque Government has now launched a tender for the works of the Arkaute link, which has made available to the company Euskal Trenbide Sarea,... [+]

2024-11-27 | Estitxu Eizagirre
Cosmetics with medicinal plants
How to wash and care without contaminating the body and the Earth?
Skin is not a superficial issue, but a limit to the outside and the protection of ourselves. However, if we use industrial cosmetics, our body introduces chemical toxins into the skin and when it moves through the hole in the shower, we contaminate the water and the Earth every... [+]

Luis González Reyes
"It is essential to overcome the capitalism of growth"
At the end of October, the Subai Erakuntza Foundation held a conference on growth in Pamplona. There, Luis González Reyes (Madrid, 1974) delivered his speech. It was based on the book published in 2023 with Adrián Almazán: “Growth: from what to how. Proposals for the... [+]

Luna de Valencia

Recently, when asked what the climate emergency consisted of, a scientist gave the excellent answer: “Look, the climate emergency is this, you increasingly see on your mobile more videos related to extreme weather events, and when you realize, it’s you who are recording one... [+]


2024-11-27 | Garazi Zabaleta
Garbiñe Elizegi, imputed at Aroztegi
“They want to criminalize the movement and set a precedent with this judgment, that is very serious”
The company Palacio de Arozteguia S.L. referred seven activists opposed to the macro-urban project Aroztegia de Lekaroz to the courts. They are asked for fines of up to EUR 56,000 and a total of 20 years in prison. A massive press conference was held on 26 November at the... [+]

2024-11-26 | Leire Ibar
The company Oxinorte de Barakaldo is fined for noise pollution
The City Hall of Barakaldo has demanded the Biscay company to pay a fine of EUR 11,800 and to close it for three months at night. Since the end of August, it emits a continuous, unpleasant and unbearable whistle that is heard throughout the environment.

Dismissing the fall to embrace the winter
December has the brown color of the leaves: from the leaves that have remained on the ground, under the naked walnut. The walnut is over its cycle. It will rest: strengthening the stems, feeding itself, aims to nourish. Looking inwards, it's time to form the bowels, after the... [+]

2024-11-25 | Jakoba Errekondo
Death of buds in cigarettes
Many plants will spend the next 100-150 half-sleepy days in the middle of the nap. The leaves that are essential for creating their own food will be released and lived thanks to the accumulated reserves in the previous 200-250 days.

2024-11-25 | Garazi Zabaleta
Chestnuts fair in the forest
The chestnuts and the culture of the protagonist chestnut
As in other localities in Navarre, four or five years ago, works on chestnuts began in Basaburua. “The Government of Navarra started an investigation related to native chestnut varieties, and that was when it started to revive the history of chestnut in the villages here,”... [+]

2024-11-25 | Iñaki Sanz-Azkue
A lizard “where there is nothing”
Lately there's a lot of talk about the forest. You will often hear about the recovery of forests, the creation of forests and the extension of forests. And it can be a good action, certainly, because its value as an ecosystem is high. But in that attention and strength that we... [+]

2024-11-22 | Estitxu Eizagirre
The Amillubi project will celebrate its first year on 1 December
The Amillubi project, which this first year has achieved 310,000 euros, is about to raise 100,000 euros for the collectivization of the farmhouse and the Amilibia land of the Iraeta district of Zestoa. This agro-ecological project launched by Biolur has already launched the land... [+]

2024-11-22 | Andoni Burguete
When the thirst for profit chokes

The disaster caused by the cold drop in Valencia has left us dramatic images, both because of the immediate consequences it has had, and because the future awaiting us has brought us forward: that this type of extreme climate phenomena will be increasingly numerous and serious... [+]


We have argued against the Navarre Energy Plan that does not plan

The update of the Navarra Energy Plan goes unnoticed. The Government of Navarre made this public and, at the end of the period for the submission of claims, no government official has explained to us what their proposals are to the citizens.

The reading of the documentation... [+]


Eguneraketa berriak daude