Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

TAV Camp in Atxondo

  • The event, to be held between 30 July and 1 August, aims to “stand before capitalist coercive policies and make known the existence of alternative life models”.

22 June 2021 - 12:44
Last updated: 14:46

In order to denounce the high-speed train, several activities have been organised and the programme will be published shortly. To participate in the camp you have to sign up through the web ahtrikezakanpada.com.

 


You are interested in the channel: Abiadura Handiko Trena
Neither galgo nor hunting dog

We have been with the "summer snake" over the TAV for a few weeks and with the possibility of linking the "Basque Y" from Pamplona, from Ezkio or Vitoria.

It is disappointing to see that our People continue to depend on decisions concerned and not supported by the galgos and... [+]


The Spanish Government says that the connection of the TAV with Ezdox-Itsaso has "problems" and bets on that of Vitoria-Gasteiz
The Spanish Minister of Transport, Óscar Puente, has assured that the connection with Navarre "is the most acceptable" in Vitoria-Gasteiz, because the Eztango-Itsaso route has "technical complexity".

Works of the TAV and Renfe: cuts and headaches in the rail service of Gipuzkoa for seven years
Since the beginning of the tunnel excavation in Gaintxurizketa in 2017, the restrictions and conditions of the works of the TAV to the Renfe railway service have been constant. Now, the Spanish Ministry of Transport has announced that this service will be interrupted for several... [+]

2024-06-06 | Jule Goñi
Stop polls, key

In the spring of last year, in Sakana, in Izan and Goierri, flooding was introduced in the municipalities of these areas for the conduct of geological surveys for the works of the TAV. In the canyoning 15 surveys have been requested in the municipalities, from Erro to Olazti /... [+]


Saturday: Day against the TAV in Pamplona

Although immersed in an unprecedented eco-social crisis, the administration continues at all costs with the work of the TAV, destroying the territory and squandering the resources essential to social needs. The works of the Castejón Bridge and the Tafalla Campanas subsection,... [+]


For fair eco-social alternatives, without VAT

Next Saturday, May 11, AHT Gelditu! Navarra organizes in Pamplona the Day against the TAV. In addition, Eco-Socialist Spaces, the World March of Women and the Charter of Social Rights have called a demonstration under the motto For a Dignified Life, A Just Eco-Social... [+]


2024-04-22 | Ahotsa.info
Sakana bets on the public and social train
A massive demonstration in Alsasua calling for the cessation of TAV works and the improvement of the current rail system.

Saturday in Altsasu the demonstration "To make the train a real means of transport"
Actors against the TAV and for the railways will hold a demonstration in Altsasu on Saturday 20 April to call for the renewal of railway infrastructure and the increase in train frequency. The respondents recall the existence of an alternative and ask that this study be... [+]

They discover remains of another Basque town in Navarra and denounce that the works of the TAV can destroy them
In the village of Muru Artederreta, on the hill of Murugain, the wall of an Iron Age village has been discovered while taking samples for TAV works. The community of neighbours denounces that the construction of the mouth of a rail tunnel would destroy part of the wall.

Julio Villanueva (AHT Gelditu)
“Abiadura Handiko Trenik gabeko Nafarroa posible da”

Abiadura Handiko Trenaren inguruan mintzatu dira zenbait ekintzaile asteazkenean Iruñeko Zabaldin osatu duten hitzaldian. Italiako Val Susa bailarako adibidea bertatik bertara ezagutzeko aukera ere izan dute han sortutako mugimenduaren ordezkari bat etorri delako... [+]


Iñaki Arriola notes that to see the works of the TAV completed it will still take a few years
The Councillor for Transport of the Basque Government has acknowledged that citizenship is "tired and annoying" with the duration of the works. It is promised that the works of the concrete infrastructure of the so-called "Basque Y" will end in 2025, but the entire upper structure... [+]

Request in Altsasu / Alsasua the adaptation of the current railway for the TAV and the social train
At the press conference held in Altsasu/Alsasua by the platforms Alde Tren Nafarroa, Araba Alde Tren and Goierriko AHTrik Ez have called for the closure of projects for the construction of new railway infrastructures for the exclusive use of fast trains, the renewal of existing... [+]

2023-11-25 | AHT Gelditu
Collective right to soil conservation

Major infrastructure and development such as the High-Speed Train that is being imposed as an essential benchmark for development, well-being and modernity or, more recently, as an element to cope with climate challenges, require a large amount of money for planning and... [+]


Eguneraketa berriak daude