Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

Concentration in Ribabellosa against the TAV project

  • Taking advantage of the Ribabellosa Trufa Fair, the Ribabellosa City Hall has organized the event "AHTrik EZ! Members of the "Valles Alaveses" platform concentrated to express their rejection of the project. At the level of Álava, several groups opposed to the High-Speed Train have launched a collection of signatures in favour of the social train.
Artikulu hau CC BY-SA 4.0 lizentziari esker ekarri dugu.

03 February 2020 - 12:19
AHTaren aurkako elkarretaratzea Ribabellosan. Argazkia: Hala Bedi.

Last Sunday, February 2, he focused on Ribabellosa under the motto “AHTrik EZ! The ‘Valles Alaveses’ platform against the high-speed line linking Vitoria-Gasteiz with Burgos.

They claimed that in the face of the project that will pass through the Álava Valley there are more sustainable and economic alternatives, such as the adequacy of existing railway lines. The high-speed train projects avoided the tunnels and viaducts they intend to build in Álava and demanded that the quality of life of rural villages be guaranteed.

They called on the entire population of Álava to mobilize in the face of this project that is going to cause serious damage to the Alaveses Valleys, with the aim of saving ‘a few minutes’ in time.

Collection of ongoing signatures

Along this road, the TAV that brings people from the counties affected by the high-speed train “AHTrik EZ! The ‘Araba’ platform has launched a collection of signatures in the country. This collection of signatures will expose the Provincial Council of Álava to its request for ratification in the wager of a quality social train: ‘Taking advantage of the current corridor, increasing the frequency of trains, taking advantage of existing stops and stops and building new stops in the province and Vitoria-Gasteiz’.

In 2017, a study was carried out on the optimization of the railway line of Álava at the request of the Provincial Council and the City Hall of Vitoria-Gasteiz. This study concluded that there was the possibility of offering a quality service that included a significant part of the Alavese population with reduced expenditure.


You are interested in the channel: AHT gelditu! elkarlana
2023-11-25 | AHT Gelditu
Collective right to soil conservation

Major infrastructure and development such as the High-Speed Train that is being imposed as an essential benchmark for development, well-being and modernity or, more recently, as an element to cope with climate challenges, require a large amount of money for planning and... [+]


2023-08-28 | Ilargi Manzanares
People report polling plans for TAV by bicycle
The march has passed through Sakana, Goierri and Llanada from 25 to 27 August, with initiatives, concerts and concentrations.

2023-08-25 | Ilargi Manzanares
Cycling marches to stop TAV polls are already underway
Against requests for authorisation of geological surveys for the construction of the High-Speed Train, several groups have organised a cycling march in Sakana and Goierri. It will cross the territories affected by the polls from 25 to 27 August.

2022-02-17 | ARGIA
AHTren kontrako eguna Iruñean: “Mitoa gainbehera erortzen ari da”

Al-TAV-oz eguna antolatu du larunbatean Nafarroako AHTren kontrako mugimenduak Iruñean, datorren larunbatean. Plazara! zentroan egun osoko jardunaldia izango da hitzaldiekin, abiadura handiko trenari buruzko hausnarketa sustatu eta "eztabaidagune bat sortzea"... [+]


2022-02-11 | ARGIA
Gasteiz eta Iruñea arteko AHTren tartea ez eraikitzea gomendatu du Europako Batzordeak

2030a aurretik Gasteiz eta Iruñea arteko AHTren tartea eraikitzeko aurreikuspenik ez dagoenez, halakorik ez eraikitzea proposatu du Europar Batzordeak. Berriaren harira, AHT Gelditu! mugimenduak adierazi du abiadura handiko trena gelditzea oraindik posible dela.


Archaeological remains found in the works of the TAV in Tafalla
The Government of Navarra has announced that the complex occupies an area of about 5,000 square metres. With the first inspections, they explained that they could be parts from the Second Iron Age. Archaeological works will begin shortly, but will not affect the deadlines set... [+]

2021-07-12 | ARGIA
Camping in Atxondo to stop the TAV
It will be held between 30 July and 1 August in the Biscay town of Bilbao. The camp organizers have warned that if the struggle is not avoided in a few months the machines can enter the territory of Atxondo and that it is more necessary and possible to stop the project. The... [+]

Cycling march against the TAV from Pamplona to Atxondo
Organized by the Navarre platform AHT Gelditu, which will be developed between 28 and 30 July 2017. Upon arrival at Atxondo, they will conduct a three-day camp in the Town Hall Square.

Four activists protest TAV at the opening of Basque Rail Way 2020
The activists have interrupted the speech of the mayor of Donostia-San Sebastian, Eneko Goia, during the presentation. The Basque Rail Way 2020 Conference is organized by the Basque Government, Euskal Trenbide Sarea and Eusko Trenbideak.

AHTren lanak geldiarazteko elkarretaratzea egingo dute Iruñean

Gobernu Delegaritza aurrean elkarretaratzea antolatu dute gaur, abuztuaren 31, 19:30ean. Erriberri eta Azkoien bitartean egin nahi dituzten lanak bertan behera uzteko eskatuko dute.


Eguneraketa berriak daude