Automatically translated from Basque, translation may contain errors. More information here. Elhuyarren itzultzaile automatikoaren logoa

Bizi performs an act in Baiona to denounce the "imposition" of the VAT

  • To denounce the "imposition" of the TAV project against popular will, the activists of the Bizi movement have hung two banners from the headquarters of the Council of the Department of the Atlantic Pyrenees in Baiona.

08 February 2023 - 12:48
Last updated: 16:15
Zarata mediatikoz beteriko garai nahasiotan, merkatu logiketatik urrun eta irakurleengandik gertu dagoen kazetaritza beharrezkoa dela uste baduzu, ARGIA bultzatzera animatu nahi zaitugu. Geroz eta gehiago gara, jarrai dezagun txikitik eragiten.

On Wednesday, at 08:15 a.m., 20 activists from the Bizi movement hang the pair of placards from the Council of the Department of Atlantic Pyrenees CD64 to denounce the imposition of the TAV project. In particular, they have demanded the suspension of the GPSO - LGV project, abbreviated for the names Grand projet ferroaire du Sud-Ouest - High-speed Line in French and Spanish. GPSO is a project designed for the south-west of France that includes the construction of two high-speed lines, one between Bordeaux and Tolosa (Occitania) and the other between Bordeaux and San Juan de Garazi. Thus, passing through Euskal Herria, this part of the TAV would join the Spanish and French States.

The banners used for the protest read two clear slogans: CD64, n'imposez pas la LGV au Pays Basque (CD64, not imposing the LGV in Euskal Herria) and CD64, no violas! Basque Country NO to the TAV!. With the action the movement wished to reaffirm its opposition to the controversial project "with enormous economic, ecological and social costs", denouncing the imposition of the project.

Remember that in December 2021 80% of the elected representatives of the Basque College voted against the project. "In Euskal Herria, within civil society and the political arena, an emblematic example of the rejection of this project," says the movement. However, the project is still on the table and in this respect the Council of the Department of the Atlantic Pyrenees and its President, Jean-Jacques Lasserre, have been questioned, "because it goes against the opinion of an entire territory directly affected by the project". The project would also involve a tax increase for citizens residing less than an hour from the TAV station.

Alongside the complaints, the movement has also called for the "modernisation" and adequacy of the existing railway. "It is a realistic, more economic and environmentally friendly alternative," they say. They recall that the mayors of Irun, Baiona and Bordeaux have asked for a study on the modernisation of the railways in order to prepare and update it. "Now there are 120 other charges that support your call," they warn.

 

 


You are interested in the channel: Abiadura Handiko Trena
The Spanish Government says that the connection of the TAV with Ezdox-Itsaso has "problems" and bets on that of Vitoria-Gasteiz
The Spanish Minister of Transport, Óscar Puente, has assured that the connection with Navarre "is the most acceptable" in Vitoria-Gasteiz, because the Eztango-Itsaso route has "technical complexity".

Works of the TAV and Renfe: cuts and headaches in the rail service of Gipuzkoa for seven years
Since the beginning of the tunnel excavation in Gaintxurizketa in 2017, the restrictions and conditions of the works of the TAV to the Renfe railway service have been constant. Now, the Spanish Ministry of Transport has announced that this service will be interrupted for several... [+]

2024-06-06 | Jule Goñi
Stop polls, key

In the spring of last year, in Sakana, in Izan and Goierri, flooding was introduced in the municipalities of these areas for the conduct of geological surveys for the works of the TAV. In the canyoning 15 surveys have been requested in the municipalities, from Erro to Olazti /... [+]


Saturday: Day against the TAV in Pamplona

Although immersed in an unprecedented eco-social crisis, the administration continues at all costs with the work of the TAV, destroying the territory and squandering the resources essential to social needs. The works of the Castejón Bridge and the Tafalla Campanas subsection,... [+]


For fair eco-social alternatives, without VAT

Next Saturday, May 11, AHT Gelditu! Navarra organizes in Pamplona the Day against the TAV. In addition, Eco-Socialist Spaces, the World March of Women and the Charter of Social Rights have called a demonstration under the motto For a Dignified Life, A Just Eco-Social... [+]


2024-04-22 | Ahotsa.info
Sakana bets on the public and social train
A massive demonstration in Alsasua calling for the cessation of TAV works and the improvement of the current rail system.

Saturday in Altsasu the demonstration "To make the train a real means of transport"
Actors against the TAV and for the railways will hold a demonstration in Altsasu on Saturday 20 April to call for the renewal of railway infrastructure and the increase in train frequency. The respondents recall the existence of an alternative and ask that this study be... [+]

They discover remains of another Basque town in Navarra and denounce that the works of the TAV can destroy them
In the village of Muru Artederreta, on the hill of Murugain, the wall of an Iron Age village has been discovered while taking samples for TAV works. The community of neighbours denounces that the construction of the mouth of a rail tunnel would destroy part of the wall.

Julio Villanueva (AHT Gelditu)
“Abiadura Handiko Trenik gabeko Nafarroa posible da”

Abiadura Handiko Trenaren inguruan mintzatu dira zenbait ekintzaile asteazkenean Iruñeko Zabaldin osatu duten hitzaldian. Italiako Val Susa bailarako adibidea bertatik bertara ezagutzeko aukera ere izan dute han sortutako mugimenduaren ordezkari bat etorri delako... [+]


Iñaki Arriola notes that to see the works of the TAV completed it will still take a few years
The Councillor for Transport of the Basque Government has acknowledged that citizenship is "tired and annoying" with the duration of the works. It is promised that the works of the concrete infrastructure of the so-called "Basque Y" will end in 2025, but the entire upper structure... [+]

Request in Altsasu / Alsasua the adaptation of the current railway for the TAV and the social train
At the press conference held in Altsasu/Alsasua by the platforms Alde Tren Nafarroa, Araba Alde Tren and Goierriko AHTrik Ez have called for the closure of projects for the construction of new railway infrastructures for the exclusive use of fast trains, the renewal of existing... [+]

2023-11-25 | AHT Gelditu
Collective right to soil conservation

Major infrastructure and development such as the High-Speed Train that is being imposed as an essential benchmark for development, well-being and modernity or, more recently, as an element to cope with climate challenges, require a large amount of money for planning and... [+]


Government now says the TAV will arrive in Bilbao in 2033
With a budget of EUR 226.52 million, the Basque Government will be responsible for drawing up the constructive project of the High-Speed Train upon its entry into Bilbao.

The Government of Spain provisionally provides the conventional rail lane for the TAV of Navarra
The Ministry of Transport proposes this as a temporary solution, which would be maintained until the Navarre TAV platform is operational between Castejón and Zaragoza.  

Eguneraketa berriak daude